CalTrans using Elephant Armor® DOT on a 3 year project to bring the bridge back to its original specification without having to fully deconstruct and reconstruct the failing 1100 columns.
Damaged and unsound concrete removed and prepped for Elephant Armor® placement.
Applying a slurry primer coat over the repair area ahead of Elephant Armor® placement.
Placing Elephant Armor® over the properly primed surface.